Respected Sir/Madam,
I, Gaurav agnihotri ,288 sanjay gandhi nagar nubasta kanpur Uttar pardesh , 208021, am filing this formal complaint against Mr. Prakhar bajpai (6394922872) & Mr. Sumit Mewati (9999770750) of RoomTailor | ARC & SQUARE Interior Design , (Reference: 12042025) for non-delivery of services despite collecting substantial payment in advance for interior work at my residential property located at 274 A , Regal, Shipra Sun city Indirapuram, Ghaziabad Uttar Pradesh 201014
Agreement and Advance Payment:
On Issue Date :10-August -25, I engaged the services of the respondent for full interior work of my residential flat. The project was to be completed within 3 months from the date of agreement. As per mutual discussion and promised deliverables, As per the said aggrement they will paid 5000/day as a detention if work is not done under the given time period, I paid a total sum of approximately ₹10,00,000 to the contractor in multiple installments. These payments were made via Online/Cash.
Despite receiving the majority of the payment, the contractor has failed to:
We have repeatedly requested a refund of the remaining amount after deducting cost for the partially completed work. However, the contractor has refused to acknowledge these requests and is now avoiding all communication.
Final payment bill has been requested multiple times no update
I request your kind intervention to ensure that justice is served.
Thank you.
I, Gaurav agnihotri ,288 sanjay gandhi nagar nubasta kanpur Uttar pardesh , 208021, am filing this formal complaint against Mr. Prakhar bajpai (6394922872) & Mr. Sumit Mewati (9999770750) of RoomTailor | ARC & SQUARE Interior Design , (Reference: 12042025) for non-delivery of services despite collecting substantial payment in advance for interior work at my residential property located at 274 A , Regal, Shipra Sun city Indirapuram, Ghaziabad Uttar Pradesh 201014
Agreement and Advance Payment:
On Issue Date :10-August -25, I engaged the services of the respondent for full interior work of my residential flat. The project was to be completed within 3 months from the date of agreement. As per mutual discussion and promised deliverables, As per the said aggrement they will paid 5000/day as a detention if work is not done under the given time period, I paid a total sum of approximately ₹10,00,000 to the contractor in multiple installments. These payments were made via Online/Cash.
Despite receiving the majority of the payment, the contractor has failed to:
- Complete the carpentry, painting, and sanitary fittings
- Install UPVC windows, grill fittings, electrical points, and the main steel door
- Provide a final detailed quotation as promised
- Replace broken tiles in the kitchen and finish flooring as committed.
We have repeatedly requested a refund of the remaining amount after deducting cost for the partially completed work. However, the contractor has refused to acknowledge these requests and is now avoiding all communication.
Final payment bill has been requested multiple times no update
I request your kind intervention to ensure that justice is served.